Installation Guide
Table Of Contents
- OpenWay Riva Gas Disconnect Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Modifications, Repairs, Installation, and Removal
- Aluminum Enclosure
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 OWRGD Installation Guide Overview
- 3 About the OpenWay Riva Gas Disconnect
- 4 Installing the OWRGD
- 5 Connecting the Flood Sensor to the OWRGD
- 6 OWRGD Operations
Decommission
In the event the OWRGD will be removed from service, the device must first be
decommissioned.
Warning! Prior to decommissioning the OWRGD, verify the gas supply is turned off.
Decommissioning the OWRGD:
■
returns the device to Factory Ship Mode with security enabled
■
disables the valve operations
■
disables some events (for example, tilt tamper)
To recommission the OWRGD, the user must get the proper signed commands from FDM and
ISM to recommission the device. Performing a Check Endpoint with FDM Tools will not
recommission the OWRGD.
Decommissioning Instructions
1. Enter the OWRGD endpoint ID.
2. Click Next.
3. Select Decommission.
4. Click Next. A window displays confirming the OWRGD was successfully decommissioned.
Programming the OWRGD
1. Enter the OWRGD Endpoint ID.
2. Select Program Endpoint.
3. Confirm or enter the Audit Mode Duration.
4. Browse to and select the OWOC file to upload.
5. Click Next. Screens appear showing the programming parameters.
6. Click Finish. The OWRGD is ready to commission.
Performing Network Operations
FDM Tools provides the interface to the perform the listed Network Operations.
■
Force Registration
■
Set BubbleUp Mode
■
Close Session