Installation Guide
Table Of Contents
- OpenWay Riva Gas Disconnect Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Modifications, Repairs, Installation, and Removal
- Aluminum Enclosure
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 OWRGD Installation Guide Overview
- 3 About the OpenWay Riva Gas Disconnect
- 4 Installing the OWRGD
- 5 Connecting the Flood Sensor to the OWRGD
- 6 OWRGD Operations
Commission Instructions
1. Enter the OWRGD Endpoint ID.
2. Using FDM Endpoint Tools, select Commission.
3. Select Next.
4. Select Valve Status to confirm the valve is commissioned.
Connect
Continue the OWRGD deployment by connecting the device. This process prepares the valve
for opening by a qualified installer or technician.
Connect Instructions
1. Enter the OWRGD Endpoint ID.
2. Click Next.
3. Using the programming device loaded with FDM Tools, select Connect.
4. Click Next.
A Confirm Valve Arming screen appears.
Respond to the warning to continue the operation. You must wait for the Valve Status screen
to appear before you turn the shaft to open the valve.