Installation Guide
Table Of Contents
- OpenWay Riva Gas Disconnect Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Modifications, Repairs, Installation, and Removal
- Aluminum Enclosure
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 OWRGD Installation Guide Overview
- 3 About the OpenWay Riva Gas Disconnect
- 4 Installing the OWRGD
- 5 Connecting the Flood Sensor to the OWRGD
- 6 OWRGD Operations
■
A clear RF signal reaches the antenna (1).
■
Gas is flowing in the proper direction (the direction indicated by the arrow on the OWRGD).
■
The valve reset shaft is accessible with the valve tool (2).
Caution: Do not install the OWRGD with the gas outflow in the down position or in
such a way that the antenna is against a wall or other structure.
14 August 2020 815-0382-00 19
OpenWay Riva Gas Disconnect Installation Guide 4 Installing the OWRGD