Figure 69Power Input Connection on the CGR Location
5. Connect the 6-Pin Male end of the PLC Signal Cable, see item 2, to the PLC Bulkhead
Connector, see item 1, on the bottom of the ACT Coupler Unit.
Figure 70PLC Signal Cable Connection on the ACT Coupler Unit Location
6. Connect the 6-Pin Female end of the PLC Signal Cable, see item 2, to the Male PLC Signal
Bulkhead Connector, see item 1, on the bottom of the CGR.
02 March 2020 815-0080-00 Itron, Inc. Page 68 of 102
OpenWay® Riva CAM3S and CAM3M Installation Guide 6 ACT Coupler Unit Installation (CAM3M Only)