1. Insert the four (8mm x 25mm) hex bolts, see item 2, supplied with the installation kit into the
threaded holes in the base mounting plate. Do not tighten bolts until all are started.
Note: The four alignment slots, see item 1, in the mounting brackets allow the CGR to be
rotated either clockwise or counterclockwise for alignment purposes. Inserting the mounting
bolts as shown allows the CGR to rotate counterclockwise. Inserting all four bolts in the holes
at the other end of the slot allows the CGR to be rotated clockwise.
2. Adjust the alignment of the CGR to the desired orientation and tighten the four mounting
bolts and the self-locking hex nut on the center stud, see item 3. Use a torque of 6 to 7ft-lb
when tightening the bolts and nut.
Figure 21Hex Bolts, Alignment Slots and Self-Locking Hex Bolt Location
3. Mount the CGR to the mounting bracket by sliding the hex bolt, see red arrow in figure and
item 1, in the top front position on each side of the CGR into the corresponding slot on the
mounting bracket.
02 March 2020 815-0080-00 Itron, Inc. Page 33 of 102
OpenWay® Riva CAM3S and CAM3M Installation Guide 4 Star and Mesh Deployment Installation