Installation Guide

Table Of Contents
Figure 19Six Captive Bolt Sequence to Tighten the CGRs Door
7. Clean the surface and affix the regulatory label (included in the CAM3S/CAM3M installation
kit) to the front bottom right of the exterior of the CGRs door shown in the figure inside the
red circle.
Figure 20Regulatory Label Placement Location
The following line should be included on the label:
Contains: FCC ID: EO9OW3
Reinstalling the CGR Back on the Pole
After installing the new CAM3S/CAM3M in the CGR, you can reinstall the mounting bracket, and
reinstall the CGR.
02 March 2020 815-0080-00 Itron, Inc. Page 32 of 102
OpenWay® Riva CAM3S and CAM3M Installation Guide 4 Star and Mesh Deployment Installation