Installation Guide

Table Of Contents
Figure 146AWG Ground Cable and Ground Lug Location
3. Remove the CGR Mounting Bracket.
a. First, loosen the top front hex bolt, see item 1, on each side of the Mounting Bracket.
b. Then, completely remove the two rear and lower front hex bolts, see item 2, on each side of
the Mounting Bracket.
Figure 15Mounting Bracket Side Hex Bolt Location
c. Next, remove the four hex bolts, see item 1, and set them aside.
d. Now, loosen the center self-locking hex nut, see item 2. This allows the Mounting Bracket to
slide upwards and off the center stud.
02 March 2020 815-0080-00 Itron, Inc. Page 28 of 102
OpenWay® Riva CAM3S and CAM3M Installation Guide 4 Star and Mesh Deployment Installation