Installation Guide
Table Of Contents
- OpenWay® Riva CAM3S and CAM3M Installation Guide
- Table of Contents
- New in this Document
- 1 About This Guide
- 2 Introduction
- 3 Installation Kits
- 4 Star and Mesh Deployment Installation
- 5 Radio Frequency and Power Line Carrier Installation
- 6 ACT Coupler Unit Installation (CAM3M Only)
- 7 Replacing an Existing CAM with a New CAM3S/CAM3M in the Field
- A Specifications
- B RF Filter Installation
- Glossary
- Index
Figure 12Battery Backup Unit (BBU) Harness Cable Connection Location
Note: For CGR's using Cisco IOS, you must disable the BBU by using the Cisco's
Internetwork Operating System (IOS) Command Line Interface (CLI) and then disconnect
the BBU Harness Cable. You can only disable the BBU by terminal or console access on
CGR's using Cisco's Guest Operating System (GOS).
5. Check the System (SYS) LED, see item 1, to ensure the CGR's power is off. The SYS LED
is located on the bottom exterior of the CGR enclosure.
02 March 2020 815-0080-00 Itron, Inc. Page 26 of 102
OpenWay® Riva CAM3S and CAM3M Installation Guide 4 Star and Mesh Deployment Installation