Figure 9AC Power Cable Connection Location
3. Loosen the six captive bolts that secure the hinged CGR door using the sequence shown
below and swing the door fully open. Use a 1/2" (13mm) socket wrench and apply a torque
of 3 to 4 foot pounds (ft-lb).
Note: The CGR's door features an environmental seal that protects the unit against
environmental elements when the door is closed. This seal creates pressure, which can
cause the door to open suddenly when the last captive bolt is loosened. Ensure you loosen
the six captive bolts that secure the CGR's door in the sequence shown in the figure and
swing the door open.
Figure 10Six Captive Bolt Sequence to Loosen the CGR's Door
The CGR's chassis hardware features Door Sensor located inside the door, see the highlighted
02 March 2020 815-0080-00 Itron, Inc. Page 24 of 102