Setup Guide
Table Of Contents
- Intelis Gas Meter Proving and Setup Guide
- Contents
- New in this Document
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Standards
- 2 Overview
- 3 Proving
- 4 Proving the Intelis Gas Meter Using the Honeywell SNAP Proving System
- 5 Proving the Intelis Gas Meter Using the Measurement Systems Proving System
- 6 Proving the Intelis Gas Meter Using the Energy Economics (EEI) Proving System
- 7 Calibrating the Intelis Gas Meter
2. Connect the Intelis Gas Meter end of the Measurement Systems pulse prover cable to the
Intelis Gas Meter by firmly pressing the aluminum round threads of the cable into the port.
Begin by positioning the cable at the 4:30 o'clock position. Tighten the cable to the 6:30
o'clock position.
Caution: Do not over tighten this, as doing so could damage the index housing or
the proving cable head.
Note: The Intelis Gas Meter automatically goes into Test Mode (Menu 6) after the cable
is properly connected to the optical port.
3. Enter the Intelis Gas Meter serial number.
08 July 2020 815-0154-00 REV 000 Itron, Inc. Page 46 of 66
Intelis Gas Meter Proving and Setup Guide
5 Proving the Intelis Gas Meter Using the Measurement Systems
Proving System