Setup Guide
Table Of Contents
- Intelis Gas Meter Proving and Setup Guide
- Contents
- New in this Document
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Standards
- 2 Overview
- 3 Proving
- 4 Proving the Intelis Gas Meter Using the Honeywell SNAP Proving System
- 5 Proving the Intelis Gas Meter Using the Measurement Systems Proving System
- 6 Proving the Intelis Gas Meter Using the Energy Economics (EEI) Proving System
- 7 Calibrating the Intelis Gas Meter
3. Select the Meter Model-1 tab.
4. Select the meter model. If the Intelis 250 or Intelis 250 TC are set up in the MMS prover, go
to step 10. If the Intelis 250 or Intelis 250 TC is not listed, continue to step 5.
5. Select the Prover tab.
Note: To access the Prover tab, you will be asked for a password. Contact
Measurement Systems if you do not have a password.
08 July 2020 815-0154-00 REV 000 Itron, Inc. Page 35 of 66
Intelis Gas Meter Proving and Setup Guide
5 Proving the Intelis Gas Meter Using the Measurement Systems
Proving System