Setup Guide
Table Of Contents
- Intelis Gas Meter Proving and Setup Guide
- Contents
- New in this Document
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Standards
- 2 Overview
- 3 Proving
- 4 Proving the Intelis Gas Meter Using the Honeywell SNAP Proving System
- 5 Proving the Intelis Gas Meter Using the Measurement Systems Proving System
- 6 Proving the Intelis Gas Meter Using the Energy Economics (EEI) Proving System
- 7 Calibrating the Intelis Gas Meter
optical sensor port typically on the top of the SNAP prover electronic enclosure, next to the
meter temperature probe port.
11. Connect the Intelis Gas Meter end of the SNAP pulse prover cable to the Intelis Gas Meter
optical port by firmly pressing the aluminum round threads of the cable into the port. Begin by
positioning the cable at the 4:30 o'clock position. Tighten the cable to the 6:30 o'clock
position.
08 July 2020 815-0154-00 REV 000 Itron, Inc. Page 29 of 66
Intelis Gas Meter Proving and Setup Guide
4 Proving the Intelis Gas Meter Using the Honeywell SNAP Proving
System