Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
4. Select Finish to return to the Tools screen.
To Unseal an Intelis gas Meter's UMU
1. From the Tools menu, select OWR Intelis Gas Riva.
2. Enter the Endpoint ID.
3. Select the Endpoint Mode.
4. Select Next.
5. Select Test Mode Operations.
6. Select the Utility ID.
7. Click Next.
8. Select Adjust Calibration for a device with a Seal State of Sealed.
A warning message appears indicating that Adjusting Calibration will unseal the meter.
9. Select Yes.
11 December 2019 TDC-1782-005 76
Intelis Gas Meter Installation Guide 6 Adjusting the Calibration