Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
Note: All other settings (Tangents, Ultra Intest Lock, Ultra Adjust Lock and Station) on
the Test Options window are not relevant for the Intelis meter.
Proving the Intelis Gas Meter
1. Connect the EEI pulse prover cable (Itron part number CFG-7100-400) to the EEI prover
index eye connector.
2. Connect the Intelis Gas Meter end of the EEI pulse prover cable to the Intelis Gas Meter by
firmly pressing the aluminum round threads of the cable into the port. Begin by positioning
the cable at the 4:30 o'clock position. Tighten the cable to the 6:30 o'clock position.
3. Connect the Intelis Gas Meter end of the EEI pulse prover cable to the Intelis Gas Meter by
firmly pressing the aluminum round threads of the cable into the port. Begin by positioning
the cable at the 4:30 o'clock position. Tighten the cable to the 6:30 o'clock position.
Note: The Intelis Gas Meter automatically enters Test Mode when the pulse output
cable is connected to the meter.
4. Press the EEI prover's green button to begin the proving test.
5. Verify the LED blinks (pulses) when the air begins to flow through the meter.
11 December 2019 TDC-1782-005 66
Intelis Gas Meter Installation Guide 5 Proving