Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
2. Connect the Intelis Gas Meter end of the Measurement Systems pulse prover cable to the
Intelis Gas Meter by firmly pressing the aluminum round threads of the cable into the port.
Begin by positioning the cable at the 4:30 o'clock position. Tighten the cable to the 6:30
o'clock position.
Note: The Intelis Gas Meter automatically goes into Test Mode (Menu 6) after the cable
is properly connected to the optical port.
11 December 2019 TDC-1782-005 56
Intelis Gas Meter Installation Guide 5 Proving