Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
3. Select the Meter Model-1 tab.
4. Select the meter model. If the Intelis 250 or Intelis 250 TC are set up in the MMS prover, go
to step 10. If the Intelis 250 or Intelis 250 TC is not listed, continue to step 5.
5. Select the Prover tab.
Note: To access the Prover tab, you will be asked for a password. Contact Meas-
urement Systems if you do not have a password.
11 December 2019 TDC-1782-005 45
Intelis Gas Meter Installation Guide 5 Proving