Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
3. Select the Global tab > Operate Valves and View Sensor Readings.
4. From the Operate Valves and Observe Sensor Readings screen, press the 1 key or Chuck
Valve to clamp the meter in place.
5. After the Intelis Gas Meter is clamped to the prover, turn on the appropriate nozzle in the cen-
ter of the screen to exercise the meter.
Note: Nozzle 6-250 is typically used for the Intelis Gas Meter.
11 December 2019 TDC-1782-005 43
Intelis Gas Meter Installation Guide 5 Proving