Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
9. Click Select Meter to advance to the next screen.
10. Connect the SNAP pulse prover cable end (Itron part number CFG-7100-100) to the J4 (1)
optical sensor port typically on the top of the SNAP prover electronic enclosure, next to the
meter temperature probe port.
11. Connect the Intelis Gas Meter end of the SNAP pulse prover cable to the Intelis Gas Meter
optical port by firmly pressing the aluminum round threads of the cable into the port. Begin by
positioning the cable at the 4:30 o'clock position. Tighten the cable to the 6:30 o'clock pos-
ition.
11 December 2019 TDC-1782-005 40
Intelis Gas Meter Installation Guide 5 Proving