Installation Guide
Table Of Contents
- Intelis Gas Meter Installation Guide
- Table of Contents
- 1 Important Safety and Compliance Information
- USA, FCC Part 15 Spectrum Compliance
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA Spectrum Compliance
- Electromagnetic Compatibility
- Intrinsic Safety
- Lithium Battery
- Transportation Classification
- Electrostatic Discharge
- Electrostatic Ignition Hazard
- Device Cleaning
- Do Not Drop
- Product Notification
- 2 Intelis Gas Meter
- 3 Installation
- 4 LCD Operation
- 5 Proving
- 6 Adjusting the Calibration
- 7 Maintenance
2. Apply new sealant to the leading 3 to 4 threads of the pipe plug.
Note: Itron recommends RectorSeal #5 sealant.
3. Using a 3/16" hand-driven Allen wrench, begin tightening the pipe plug into the threads,
using care not to cross-thread or remove the sealant during the process.
4. Tighten the pipe plug. Do not exceed 50 inch-pounds torque (5.6 Newton Meters).
5. Leak test following your utility's leak test procedure.
11 December 2019 TDC-1782-005 19
Intelis Gas Meter Installation Guide 3 Installation