Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
10. (Recommended) Rerun the meter on the prover station to verify the meter calibration. It is
expected that you see the results that match the following example:
If the accuracy results are not as expected, repeat the calibration steps.
Note: Prover station accuracy is estimated to be +/- 0.15-0.25%.
T
o seal an Intelis gas meter
1. From the Tools menu, select OWR Intelis Gas Riva.
2. Select Test Mode Operations.
3. Select Seal Meter.
A progress bar indicates that the meter is sealing.
Adjusting the Intelis Gas Meter Calibration
Intelis Gas Meter Installation Guide TDC-1782-002 58
Proprietary and Confidential