Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
2. Connect the Intelis Gas Meter end of the EEI pulse prover cable to the Intelis Gas Meter
by firmly pressing the aluminum round threads of the cable into the port. Begin by
positioning the cable at the 4:30 o'clock position. T
ighten the cable to the 6:30 o'clock
position.
Note: The Intelis Gas Meter automatically enters Test Mode when the pulse output cable
is connected to the meter.
3. Press the EEI prover's green button to begin the proving test.
4. Verify the LED blinks (pulses) when the air begins to flow through the meter.
Proving the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 51
Proprietary and Confidential