Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
11. Click Done to complete the Meter Information > T
est Options and close the window.
Note: All other settings (T
angents, Ultra Intest Lock, Ultra Adjust Lock and Station) on the
Test Options window are not relevant for the Intelis meter
Proving the Intelis Gas Meter
1. Connect the EEI pulse prover cable (Itron part number CFG-7100-400) to the EEI prover
index eye connector.
Proving the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 50
Proprietary and Confidential