Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
Note: Logging on to the EEI prover application requires maintenance level security
.
2. Select Maintain > Sensor Maintenance.
3. Clamp the Intelis Gas Meter to the prover and turn on appropriate nozzles in the center
column of the Sensor Maintenance window to exercise the meter
.
Note: Nozzle 192 CFH is typically used to exercise the Intelis Gas Meter.
4. Exercise the meter for 10 to 60 minutes until the Out T
emp value does not vary by more
than 0.2° F within a minute.
5. Close the nozzle.
Proving the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 45
Proprietary and Confidential