Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
2. Connect the Intelis Gas Meter end of the Measurement Systems pulse prover cable to
the Intelis Gas Meter by firmly pressing the aluminum round threads of the cable into the
port. Begin by positioning the cable at the 4:30 o'clock position. T
ighten the cable to the
6:30 o'clock position.
Note: The Intelis Gas Meter automatically goes into Test Mode (Menu 6) after the cable is
properly connected to the optical port.
3. Enter the Intelis Gas Meter serial number.
Proving the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 43
Proprietary and Confidential