Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
23. Press or click the green bar at the bottom of the screen to exit the Meter Setup Menu.
Proving the Intelis Gas Meter
1.
Connect the Measurement Systems pulse prover cable (Itron part number
CFG-7100-500) to the port on the left side of the Measurement Systems prover.
Note: If your Measurement Systems prover does not look like the illustration, contact
Measurement Systems for an adapter cable to connect the Measurement Systems pulse
prover cable to your prover.
Proving the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 42
Proprietary and Confidential