Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
3. Select the Meter Model-1 tab.
4. Select the meter model. If the Intelis 250 or Intelis 250 TC are set up in the MMS prover,
go to step 10. If the Intelis 250 or Intelis 250 TC is not listed, continue to step 5.
5.
Select the Prover tab.
Note: To access the Prover tab, you will be asked for a password. Contact Measurement
Systems if you do not have a password.
6. Select Enter New Meter Model.
Proving the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 35
Proprietary and Confidential