Installation Guide
Table Of Contents
- Contents
- Important Safety and Compliance Information
- USA, FCC Part 15 spectrum compliance
- Canada, ISED spectrum compliance
- RF Exposure (FCC/ISED)
- Australia, ACMA spectrum compliance
- Electromagnetic compatibility
- Intrinsic safety
- Lithium battery
- Transportation classification
- Electrostatic discharge
- Electrostatic ignition hazard
- Device cleaning
- Do not drop
- Product notification
- Intelis Gas Meter
- Installing the Intelis Gas Meter
- Intelis Gas Meter LCD Operation
- Proving the Intelis Gas Meter
- Adjusting the Intelis Gas Meter Calibration
- Intelis Gas Meter Index Replacement
Installing the pipe plug
1. Clean any debris from the pipe plug and inspect it for any damage or deformation.
Replace the pipe plug if any defects or wear are found.
2. Apply new sealant to the leading 3 to 4 threads of the pipe plug.
Note: Itron recommends RectorSeal #5 sealant.
3. Using a 3/16" hand-driven Allen wrench, begin tightening the pipe plug into the threads,
using care not to cross-thread or remove the sealant during the process.
4. Tighten the pipe plug. Do not exceed 50 inch-pounds torque (5.6 Newton Meters).
5. Leak test following your utility's leak test procedure.
Installing the Intelis Gas Meter
Intelis Gas Meter Installation Guide TDC-1782-002 14
Proprietary and Confidential