User's Manual

Table Of Contents
Installing the Collector or Repeater
48 TDC-0971-011 CCU 100 and Repeater 100 Installation Guide
3. Wire the five-conductor power cable to the solar cabinet, as shown in the Solar
Wiring Diagram on page 46. Use the watertight grommet supplied with the solar
cabinet.
Red. Collector or repeater power +
Black. Collector or repeater power -
Green. Low battery indicator
Orange. Solar ID_1
White. Solar ID_2
4. Mount the collector or repeater in the desired location.
Note The supplied power cable from the solar battery box to the CCU/repeater is
only 12 feet long.
5. Place the 12V battery in the battery box.
6. Connect a ground wire to the collector grounding lug.
7. If required, connect the antenna and Ethernet cables to the CCU/repeater.
For instructions on installing the antennas, see Attaching the External GPS/WAN
Antennas on page 20.
8. Connect the power cable to the CCU.
To set array tilt and array azimuth angles using the PVWatts website
1. Go to http://gisatnrel.nrel.gov/PVWatts_Viewer/index.html.
2. Type the Zipcode, the Address, or the Coordinates for the solar installation and
click Go.
3. Click Send to PVWatts.