User's Manual

Table Of Contents
Sample Sweeps Output
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 121
Providing all required tools, equipment and capable field crews that are required to
properly install Itron network devices, including modern Clamp-on ground testing
equipment.
Note Supplier is responsible for ensuring all Supplier managed field crews meet any
local labor and / or pay requirements, such as union requirements, Local Business,
mandatory minimum "Living Wages", as may be required.
Include the expected equipment and costs associated with performing grounding
testing, per the current version of the Itron Grounding Specifications.
Compiling a package of as-built and closeout documentation in a compact electronic
format (Adobe .pdf files preferred) and e-mailing each site package to the Itron PM
development within 3 business days following each completion.