Installation Guide
Table Of Contents
- CCU 100 and Repeater 100 Installation Guide
- Important Safety and Compliance Information
- 1 Before You Begin
- 2 CCU/Repeater Basics
- 3 Planning a CCU/Repeater Installation
- 4 Installing the Collector or Repeater
- 5 Battery Care and Maintenance
- A Detailed Collector or Repeater Specifications
- B Port and Protocol Requirements
- C Status and Diagnostics
- D Changing the Repeater Password
- E Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 915 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 915 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- F Grounding Specifications
- Understanding Grounding and Bonding
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Grounding antennas on rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
ensure the installations meet the Itron and customer quality and design requirements.
■
Physical attendance at all remote antenna coax sweeps testing and final punch-walk
inspections. Itron will communicate any supplier workmanship concerns, to the supplier, as
soon as physically possible.
■
Validation of the functionality of each Itron TCU 100, CCU 100, and Repeater 100 device,
once the supplier has completed an installation and the devices are turned on.
Supplier’s Responsibilities
The supplier is responsible for the following aspects of the test:
■
Performing the physical work required to install the Itron network devices, in accordance with
the Itron provided documentation and training, including site grounding.
■
Installing, where required, proper weatherproofing and grounding to ensure safe operation
of equipment.
■
Performing all antenna / coax sweep testing, documenting each network device installation
with at least 10 digital pictures and reporting as-built GPS coordinates and antenna
centerline heights, by the "tape drop" method.
■
Providing all required tools, equipment and capable field crews that are required to properly
install Itron network devices, including RF testing equipment.
Note: Supplier is responsible for ensuring that all supplier managed field crews meet any
local labor and / or pay requirements, such as union requirements, local business,
mandatory minimum "Living Wages", as may be required.
■
Include the expected equipment and costs associated with performing any coax, jumper, and
antenna sweep testing, per the current version of the Itron Remote Antenna Sweep Test.
For more information, see Testing on a Network Device with a Remotely-Mounted 915
MHz Antenna on page 95.
■
Compiling a package of as-built and closeout documentation in a compact electronic format
(Adobe .pdf files preferred) and e-mailing each site package to the Itron PM development
within three business days following each completion.
Itron ChoiceConnect Antenna and Line Sweep Test Form
This attachment contains an example of the Itron ChoiceConnect® Antenna and Coax Sweep
Test Form. Itron provides this form to the supplier, so that the supplier can determine their fixed
fee, lump sum, and all inclusive pricing needed to complete the expected number of network
device installations.
The following illustration shows the test form.
23 June 2020 TDC-0971-012 Itron, Inc. Page 98 of 134
CCU 100 and Repeater 100 Installation Guide E Antenna Line Sweeps Procedure