Installation Guide
Table Of Contents
- CCU 100 and Repeater 100 Installation Guide
- Important Safety and Compliance Information
- 1 Before You Begin
- 2 CCU/Repeater Basics
- 3 Planning a CCU/Repeater Installation
- 4 Installing the Collector or Repeater
- 5 Battery Care and Maintenance
- A Detailed Collector or Repeater Specifications
- B Port and Protocol Requirements
- C Status and Diagnostics
- D Changing the Repeater Password
- E Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 915 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 915 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- F Grounding Specifications
- Understanding Grounding and Bonding
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Grounding antennas on rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
Note: Note Equipment must be calibrated per manufacturer suggested calibration
period. Record the test equipment manufacturer, model number, and calibration
expiration date on the Itron ChoiceConnect Antenna and Line Sweep Test Form
on page 98.
The following illustration shows the Anritsu Site Master.
Testing on a Network Device with a Remotely-Mounted 915
MHz Antenna
When the 915 MHz antenna is remotely mounted, perform antenna and line sweeping tests to
verify that the transmission system functions within acceptable tolerances. While monitoring
sweep results, move all connectors on jumpers and coax to ensure all connectors are properly
installed and reliable.
Note: There should be no variance in sweep tests while stressing connections.
General Testing Conditions
Perform sweep testing under the following general testing conditions:
■
Overall System Return Loss: Must be -14 dB or better for the specified frequency band.
Any deviations from this return loss warrant further investigation.
■
VSWR Expected Results: 1.5 : 1 or less for the specified frequency band.
■
Test Point: Feed line connected to the antenna at the top; test from the lightning (or surge)
23 June 2020 TDC-0971-012 Itron, Inc. Page 95 of 134
CCU 100 and Repeater 100 Installation Guide E Antenna Line Sweeps Procedure