Installation Guide
Table Of Contents
- CCU 100 and Repeater 100 Installation Guide
- Important Safety and Compliance Information
- 1 Before You Begin
- 2 CCU/Repeater Basics
- 3 Planning a CCU/Repeater Installation
- 4 Installing the Collector or Repeater
- 5 Battery Care and Maintenance
- A Detailed Collector or Repeater Specifications
- B Port and Protocol Requirements
- C Status and Diagnostics
- D Changing the Repeater Password
- E Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 915 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 915 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- F Grounding Specifications
- Understanding Grounding and Bonding
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Grounding antennas on rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
CCU Installation Wiring Diagram
Tower Installation
Warning! Before installing a Tower CCU, ensure that the selected location can
support the weight of the Tower CCU and mounting hardware. A thorough structural
analysis should be performed by a registered professional engineer at location prior to
installation. Itron is not responsible for improper installations or for installations at a site
that cannot adequately support the Tower CCU.
You must use 3/8–16 bolts to secure the enclosure to the pierced and slotted metal brackets.
All coaxial cable connections must be properly weather-proofed per industry standards unless
otherwise specified. This includes any connections for the antennas and the Tower CCU. If the
Tower CCU is installed indoors, only the connections located outside must be weather-proofed.
23 June 2020 TDC-0971-012 Itron, Inc. Page 53 of 134
CCU 100 and Repeater 100 Installation Guide 4 Installing the Collector or Repeater