Installation Guide

Table Of Contents
Note: SPDs are required to be installed at the building entry point to reduce the radiated
RF energy generated by a lightning strike. Terminate unused coaxial cables connected to
the outside by grounding the shield to the ground entry port and installing a SPD with a
shorting stub or 50 ohm load. Do not allow excess cable to come in contact with
equipment or personnel.
23 June 2020 TDC-0971-012 Itron, Inc. Page 120 of 134
CCU 100 and Repeater 100 Installation Guide F Grounding Specifications