Installation Guide

Table Of Contents
Supplier’s Responsibilities 98
Itron ChoiceConnect Antenna and Line Sweep Test Form 98
Itron ChoiceConnect 915 MHz Antenna Specifications 99
Technical Data 100
Typical Coaxial Cable Specification Summary Table 100
Sample Sweeps Output 101
F Grounding Specifications 104
Understanding Grounding and Bonding 105
Understanding the Ohms Level 105
Reducing the Ohms level 105
Using a Megger 106
Adjusting the Routing of the Grounding Conductor 107
Supplier General Requirements and Equipment Competencies 108
Exterior Grounding System Design for Concentrators 108
Existing Building or Rooftop Sites 111
Co-Located Sites & Other Existing Structures 112
New Wood Pole Sites 112
Equipment Buried Ground Ring 112
Chemical Ground Rod Installation 113
Installing a Chemical Ground Rod 113
Itron Concentrator Equipment 114
TCU / CCU on a Concrete Pad 115
TCU / CCU on a Steel Frame or I-Beam or Platform 115
TCU / CCU on a Raised Metal Platforms 115
TCU / CCU / Repeater Remote Antennas & Coax on Towers 116
Installing Coax Ground Kits 116
Installing Coax Ground Kits at the Top of a Tower 117
Installing Coax Ground Kits at the Bottom of the Tower 117
Installing a Coax Ground Kit to End of Ice Bridge 118
Attaching a Coax Ground Kit at GPS and WAN Antenna 118
Grounding a Coax Ice Bridge 118
Collector Sites with Indoor Itron TCU / CCU Equipment 119
RF Components Protection (Coax) 119
Grounding Rooftop Network Devices 121
Grounding Rooftop Network Devices 121
23 June 2020 TDC-0971-012 Itron, Inc. Page 10 of 134
CCU 100 and Repeater 100 Installation Guide Table of Contents