User's Manual
Table Of Contents
- Before You Begin
- CCU/Repeater Basics
- Planning a CCU/Repeater Installation
- Installing the Collector or Repeater
- Installation Overview
- Attaching the Local GPS/WAN Antennas
- Attaching the Direct Mount Standard (5.15 dBi) 900 MHz Antenna
- Attaching the Collector or Repeater
- Connecting Cables
- Installing a Local 4G WAN Antenna
- Installing the Battery
- Providing Power
- CCU Installation Wiring Diagram
- Tower Installation
- Solar Powered Installation
- Relocating a CCU or Repeater
- Battery Care and Maintenance
- Detailed Collector or Repeater Specifications
- Port and Protocol Requirements
- Status and Diagnostics
- Changing the Repeater Password
- Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 900 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 900 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- Grounding Specifications
- Understanding Grounding and Bonding
- Understanding the Ohms Level
- Reducing the Ohms level
- Using a Megger
- Adjusting the Routing of the Grounding Conductor
- Supplier General Requirements and Equipment Competencies
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
- Understanding Grounding and Bonding
- Index
Sample Sweeps Output
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 119
Proprietary and Confidential
The following illustration shows an overview of the testing location.
Testing Procedures
To prepare the meter
1. Ensure mating surfaces of the jaws are clean and free of corrosion.
2. Press and hold the ON/OFF button for approximately 3 seconds.
3. Verify the clamp-on ground resistance tester enters the self-test mode and displays the
remaining battery life. If the battery does not have enough life remaining to complete
the job, replace the battery as described in the user’s manual.
4. Verify the calibration of the meter with the calibration loop. Refer to the
Manufacturer’s User’s Manual for tolerances.
Measuring Rod/Grid Resistance
Warning High voltages may be present in and around the point of
measurement. Take caution to avoid serious injury or death.
To test the current measurement
1. Remove any molding that covers the conductor, providing room for the jaws of the
clamp-on ground resistance tester to close completely around the conductor.
2. Press the ON/OFF button.