User's Manual

Table Of Contents
Grounding Specifications
108 TDC-0971-011 CCU 100 and Repeater 100 Installation Guide
Note SPDs are required to be installed at the building entry point to reduce the
radiated RF energy generated by a lightning strike. Terminate unused coaxial cables
connected to the outside by grounding the shield to the ground entry port and
installing a SPD with a shorting stub or 50 ohm load. Do not allow excess cable to
come in contact with equipment or personnel.