Installation Guide
Table Of Contents
- CCU100 and Repeater100 Installation Guide
- Important Safety and Compliance Information
- 1 Before You Begin
- 2 CCU/Repeater Basics
- 3 Planning a CCU/Repeater Installation
- 4 Installing the Collector or Repeater
- 5 Battery Care and Maintenance
- A Detailed Collector or Repeater Specifications
- B Port and Protocol Requirements
- C Status and Diagnostics
- D Changing the Repeater Password
- E Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 915 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 915 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- F Grounding Specifications
- Understanding Grounding and Bonding
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Grounding antennas on rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
■
Results: Test results must be saved in PDF format.
■
Test Equipment Requirements: Current and proper calibration; be sure that calibration is
turned on during the test. A qualified operator of the test equipment must perform the test.
Note: Note If the system does not perform to the above test specifications, the reasons
for system failure and possible remedies must be identified before leaving the site.
Specific Testing Conditions
Perform sweep testing under the following specific testing conditions:
Note: Attach a copy of each trace to the antenna sweep checklist so that the Itron Field
Engineer can inspect and sign off on acceptable results.
Antenna Return Loss Test: Complete a return loss test of the remote antenna on the ground
prior to installation. Determine the quality of the impedance match to 50-ohms at the antenna
connector. This test is performed with the test equipment calibrated for a one- port return loss
measurement to the end of the test cable. Ensure that the antenna is positioned vertically, at
least 24" above the ground, and at least 24" away from any metallic structure or equipment.
1. Configure the test equipment in return loss mode and calibrate.
2. Identify if the antenna passes or fails based on antenna manufactures specification. For
more information about the antenna specifications, see Itron ChoiceConnect 915 MHz
Antenna Specifications on page 99.
3. Save the trace for printing. This shall include site and sector numbers for identification.
System Test Parameters:
Sweep Range: 902 - 928 MHz
Markers: M1 - 902 MHz, M2 – 928 MHz
Overall System Return Loss Test: Sweep test of entire transmission system including:
antenna, coax, jumpers, and protection devices. Parameters of tests to be provided. While
monitoring the sweep results, move connectors on jumpers and coax to ensure all connections
are reliable. There should be no variance in sweep tests while stressing connections. The
purpose of this test is to ensure total system return loss is within acceptable limits.
1. Configure the test equipment in return loss mode and calibrate.
2. Identify if the system return loss passes or fails. The antenna specifications are attached to
this document as Attachment B.
3. Save the trace for printing. This shall include site and sector numbers for identification.
System Test Parameters:
CCU100 and Repeater100 Installation Guide E Antenna Line Sweeps Procedure
12 February 2021 815-0491-00 Itron, Inc. Page 96 of 133