Installation Guide
Table Of Contents
- CCU100 and Repeater100 Installation Guide
- Important Safety and Compliance Information
- 1 Before You Begin
- 2 CCU/Repeater Basics
- 3 Planning a CCU/Repeater Installation
- 4 Installing the Collector or Repeater
- 5 Battery Care and Maintenance
- A Detailed Collector or Repeater Specifications
- B Port and Protocol Requirements
- C Status and Diagnostics
- D Changing the Repeater Password
- E Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 915 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 915 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- F Grounding Specifications
- Understanding Grounding and Bonding
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Grounding antennas on rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
3. Press the ferrite bead into the recess in the battery well and slide it down as far as it will go
without putting stress on the connector.
4. Place the battery in the battery well as shown in the following graphic.
5. Replace the battery compartment cover and tighten the screws to 6 inch-pounds.
Power
The final step of the collector or repeater installation is to provide power to the equipment.
Depending on the collector or repeater model, either a two pin cable (DC), three pin cable (AC),
or a five pin cable (solar) is required.
Caution: Caution Do not move or tilt the collector for one minute after connecting
power. Moving or tilting a collector too soon after connecting power causes the factory
software and configuration to be loaded.
Warning! Securely mount the collector or repeater before connecting the dedicated
AC mains power source.
The collector or repeater must be grounded by either the ground wire in the three
conductor cable, or the grounding lug on the bottom of the equipment. For installations
that use the photocell adapter, the grounding lug must be used to ground the collector.
CCU100 and Repeater100 Installation Guide 4 Installing the Collector or Repeater
12 February 2021 815-0491-00 Itron, Inc. Page 52 of 133