Installation Guide

Table Of Contents
where they enter the equipment room or area.
Note: SPDs are required to be installed at the building entry point to reduce the radiated
RF energy generated by a lightning strike. Terminate unused coaxial cables connected to
the outside by grounding the shield to the ground entry port and installing a SPD with a
shorting stub or 50 ohm load. Do not allow excess cable to come in contact with
equipment or personnel.
CCU100 and Repeater100 Installation Guide F Grounding Specifications
12 February 2021 815-0491-00 Itron, Inc. Page 119 of 133