User's Manual

Table Of Contents
Chapter 3 Installing the Collector or Repeater
40 TDC-0971-011 CCU 100 and Repeater 100 Installation Guide
Wall/H-Frame mount. In this configuration, the TCU is bolted to a stable and secure
vertical surface, such as a wall or h-frame, with 3/8–16 (min) bolts and pierced and
slotted brackets (no kit).
The TCU box comes preassembled except for the CCU.
Caution Prior to installing a CCU in the field, be sure to configure it as described in
the CCU 100 Collector Configuration Guide. A CCU cannot be configured after it has
been installed in the field. Repeaters do not require pre-installation configuration.