User's Manual
Table Of Contents
- Before You Begin
- CCU/Repeater Basics
- Planning a CCU/Repeater Installation
- Installing the Collector or Repeater
- Installation Overview
- Attaching the Local GPS/WAN Antennas
- Attaching the Direct Mount Standard (5.15 dBi) 900 MHz Antenna
- Attaching the Collector or Repeater
- Connecting Cables
- Installing a Local 4G WAN Antenna
- Installing the Battery
- Providing Power
- CCU Installation Wiring Diagram
- Tower Installation
- Solar Powered Installation
- Relocating a CCU or Repeater
- Battery Care and Maintenance
- Detailed Collector or Repeater Specifications
- Port and Protocol Requirements
- Status and Diagnostics
- Changing the Repeater Password
- Antenna Line Sweeps Procedure
- Anritsu Site Master Calibration
- Testing on a Network Device with a Remotely-Mounted 900 MHz Antenna
- Understanding Party Responsibilities
- Itron ChoiceConnect Antenna and Line Sweep Test Form
- Itron ChoiceConnect 900 MHz Antenna Specifications
- Typical Coaxial Cable Specification Summary Table
- Sample Sweeps Output
- Grounding Specifications
- Understanding Grounding and Bonding
- Understanding the Ohms Level
- Reducing the Ohms level
- Using a Megger
- Adjusting the Routing of the Grounding Conductor
- Supplier General Requirements and Equipment Competencies
- Exterior Grounding System Design for Concentrators
- Equipment Buried Ground Ring
- Chemical Ground Rod Installation
- Itron Concentrator Equipment
- Installing Coax Ground Kits
- Collector Sites with Indoor Itron TCU / CCU Equipment
- Grounding Rooftop Network Devices
- Down Conductor Installation
- Cold Water Pipe Option
- Building Steel Option
- Antenna and Coax Grounding - Rooftops
- Cable Tray Grounding
- Water Tower Grounding
- New Wooden and Concrete Antenna Poles
- Equipment Shelter Grounding
- Repeaters on Communication Tower Sites
- Repeaters on Rooftops
- Multiple Story Site Ground System
- Down Conductors Installation - Building / Shelter Penetrations
- Down Conductors Installation - Limits of Bend Radius
- Down Conductors Installation Connection Methods
- Cable Entrance Facilities
- Clamp-On Ground Resistance Testing
- Understanding Party Responsibilities
- Understanding Grounding and Bonding
- Index
Sample Sweeps Output
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 111
Proprietary and Confidential
Down Conductor Installation
Each down conductor must consist of 4/0 AWG stranded copper with green insulation.
Preferably, install the down conductor without conduit. If a conduit is required by local
standards or by the landlord, then a non-metallic PVC conduit is preferred. If a metallic
conduit is required, use the threaded type and install grounding bushings on both ends to
bond the conduit with a minimum of No. 2 AWG stranded copper conductor to the
ground bar at each end. The metallic conduit must be bonded at both ends to a ground bar
to prevent a choke effect in the event of a surge.
A low halogen cable that meets the ratings of Telcordia GR-347 is acceptable. Place the
MGB bar as close as possible to the equipment cabinets and the path to ground options
(for example, ground rod, cold water pipe, or building steel). Install the ground bar to
ensure that the wire bending radii for the 4/0 AWG and No. 2 AWG are a minimum of 12
inches and that all paths to ground travel flat or down.
Warning Never allow a path to ground to travel upward.
Cold Water Pipe Option
The location of the cold water main is usually in the basement or in the mechanical room
of the building. When attaching to the pipe, the clamp must come into contact with a
minimum of 4 linear inches of pipe or utilize a Burndy GAR clamp.
To ground a cold water pipe
1. Drill the clamp to accept a two-hole ½ inch hardware lug. You can also connect the
water pipe by attaching the ground conductor using an approved water pipe clamp.
2. Scrape clean the area of contact to the cold water pipe with the clamp. The area must
be free of paint, rust and/or corrosion and coated with an approved anti-oxidation
compound before the clamp is attached to the pipe.
3. Locate the clamp on the interior of the building, within five feet of the cold water pipe
entry point into the building, without any flanges, or pipe connections between the
ground clamp and the pipe building entry point.
Note This is required to ensure good continuity to ground at the point of pipe contact
and building entry.
4. If the connection is made on the output side of the water meter, you can install an
electrical jumper (minimum 4/0 AWG) around the meter to another clamp to provide
a continuous path to ground, in the event the water meter is removed for service.
Building Steel Option
When attaching to building steel for a grounding path, use exothermic weld connections
installed per manufacturer’s recommendation.