User's Manual
Installation
2-6 CENTRON Meter Technical Reference Guide
Figure 2.5 Board-to-Board Connector, Bottom
8 Ensure the board-to-board connector is fully seated by pressing firmly in on
the middle of the connector.
Figure 2.6 Board-to-Board Connector, Top
9 Carefully replace the inner protective cover. Engage the top snaps first, taking
care to place the slot at the top of the cover over the IR light pipe. Failure to do
so could break the light pipe. Ensure that all four meter base tabs are engaged
with the slots at the top and bottom of the inner cover.
Be sure to use the meter base for leverage instead of the LCD holder (see Figure 2.5). Pressure
on the LCD holder may damage the personality module.