60W-R and 60WP-R Endpoints Installation Guide -R Endpoints
Identification 60W-R and 60WP-R Endpoints Installation Guide 08/29/2008 PUB-0771-100 Copyright © 2008 Itron, Inc. All rights reserved. Trademark Notice Itron is a registered trademark of Itron, Inc. All other product names and logos in this documentation are used for identification purposes only and may be trademarks or registered trademarks of their respective companies.
Contents Before You Begin .......................................................................................................... v How This Document is Organized ....................................................................................................... v Documentation Conventions ............................................................................................................... v About the 60W-R and 60WP-R Endpoints .............................................................
Contents iv 60W-R and 60WP-R Endpoints Installation Guide
Before You Begin This document describes the installation of the 60W-R and 60WP-R Endpoints, including pipe mountings, wall mountings, and direct-to-register attachments. How This Document is Organized This document is organized as follows: Chapter 1: About the 60W-R and 60WP-R Endpoints Provides general information about the 60W-R and 60WP-R Endpoints, with an overview of the operating modes and installation options.
Before You Begin vi 60W-R and 60WP-R Endpoints Installation Guide
CHAPTER 1 About the 60W-R and 60WP-R Endpoints The 60W-R and 60WP-R Endpoints are Automatic Meter Reading (AMR) endpoints that collect consumption and tamper information and transmit the data in a bubble-up fashion. Approximately every seven seconds, the endpoint transmits a standard consumption message (SCM) at approximately +10 dBm (10 milliwatts) between 910-920 MHz. A variety of meter register protocols are supported.
Chapter 1 About the 60W-R and 60WP-R Endpoints 60W-R Startup Sequence The 60W-R is shipped in a sleep state. Register reads and data transmissions start after initialization of the endpoint. To initialize, place one of the supplied gel connectors on the yellow and brown wires and then crimp. Be sure to use a crimping tool designed for 3M's Y2 gel connectors. See Appendix A on page 35. Maintain the connection for at least 3 seconds and then remove the connector by cutting the wires.
60WP-R Startup Sequence 60WP-R Startup Sequence The 60WP-R is shipped from the factory in a sleep state. To initialize the unit a special magnet pen (Itron part number MLD-0175-001) is placed in the small indentation on the front face of the enclosure. See Activating 60WP-R Programming Mode on page 33. After initiating, the endpoint operates in one of the following modes: - This mode is used to program the endpoint with a starting meter register value and/or unique utility operating parameters.
Chapter 1 About the 60W-R and 60WP-R Endpoints Installation Options The 60W-R and 60WP-R Endpoints can be installed in the following ways: Remote Mount: The endpoint mounts to a flat surface and connects to the meter register with a cable (up to 300 feet). This installation option requires the remote mount kit (CFG-0771-021). Pipe Mount: Installs the endpoint on a pipe near the meter rather than on a wall surface.
CHAPTER 2 Installing the 60W-R and 60WP-R Endpoints There are two tasks involved in the 60W-R and 60WP-R Endpoints installation: Mounting the endpoint to a pipe, wall surface, rod, or directly to a meter register Wiring the endpoint to the meter Pipe Mount Installation The endpoint can be mounted on a pipe either vertically, diagonally, or horizontally using either the CFG-0217-504 or CFG-0217-503 pipe mounting kit in conjunction with the remote mount kit (CFG-0771-021).
Chapter 2 Installing the 60W-R and 60WP-R Endpoints 3. Push the end of the band through the hole in the pipe bracket. Pass end of band clamp through the hole 4. Place the band clamp around the pipe. 5. Push the end of the band through the hole in the band clamp and into the entrance to the screw assembly. Entrance to screw assembly Pass end of the band through this hole 6. Tighten the band clamp until the end of the band can be pushed into the hole in the pipe bracket.
Pipe Mount Installation 7. Tighten the clamp screw three or four more turns to make sure the end of the band does not pop back out on this side of the pipe bracket. 8. Position the band clamp as shown then fully tighten the band clamp screw. 9. Place the adapter plate on the pipe bracket. The adapter-plate screw boss goes into this pipe-bracket recess.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints When the adapter plate is properly positioned on the pipe bracket, it looks like this (see below). 10. Obtain two half-inch adapter-plate mounting screws from the installation kit. 11. Connect the adapter plate to the pipe bracket (see below). Put screws in these holes 12. Tighten both screws to 9 to 12 inch-pounds of torque.
Pipe Mount Installation To mount the adapter plate in other positions The installation procedure in the previous section shows how to mount the adapter plate on a vertical pipe. The following pictures show the adapter plate on angled and horizontal pipes. Regardless of the angle of the pipe, the adapter plate mounting lug must always be at the top. If the pipe is at a 45 degree angle up to the right, install the adapter plate as shown in the pictures below.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints If the pipe is horizontal, install the adapter plate as shown in the pictures below. Mounting lug Screws To mount the 60W-R and 60WP-R Endpoints on the adapter plate 1. Obtain two 1-inch mounting screws from the pipe mount installation kit. 2. Place the back of the endpoint against the face of the adapter plate.
Pipe Mount Installation The adapter-plate mounting lug should be just above the endpoint mounting lug recess. Mounting lug Mounting lug recess 3. Slide the endpoint back cover onto the adapter, pushing up to secure the lug adapter in the lug slot. Ensure that the register cable is routed along the pipe and use a cable tie to secure it to the pipe.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints 4. Install the two remaining endpoint mounting screws. When the endpoint is properly mounted on the adapter plate, it should look like this (see below). 5. Tighten the screws to 9 to 12 inch-pounds of torque. To install tamper seals and cable ties 1. Obtain two new tamper seals from the installation kit. 2. Place a new tamper seal over each endpoint mounting screw. 3.
Pipe Mount Installation The 60W-R and 60WP-R Endpoints should look like this after the tamper seals have been installed (see below). 4. Secure the cable to the meter pipe with a cable tie. 5. Push any excess wire up between the back of the endpoint and the face of the adapter plate.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints Remote Mount Installation Wire the endpoint to the register as described in Connecting the 60W-R and 60WP-R Endpoints on page 23. Using a spare backplate, create a drilling template by drilling through a backplate lug slot to mark the position of the screw. Use the drilled backplate as your mounting template. The arrow on the endpoint must point up when the installation is complete.
Remote Mount Installation 5. Screw the endpoint to the wall using the remaining two mounting screws. 6. Insert a tamper seal over each mounting screw and drive into place with a nut driver or a similar tool. Note A tamper seal is fully seated when the top of the tamper seal is approximately 1/16 inch below the top of the screw recess. 7. Secure the cable as needed, using the provided cable ties.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints Direct-Mount Register Mounting This section describes how to attach the 60W-R and 60WP-R Endpoints to the following direct mount meter registers Badger ADE and RTR Elster/AMCO (ABB) Scancoder, InVISION, and Digital Caution You must perform the steps outlined in 60W-R Start-up Sequence on page 2 before attaching the 60W-R to the meter. To install the Badger Direct-Mount Caution Ensure you have a Badger meter with a register designed for direct mounting.
Direct-Mount Register Mounting 1. Obtain a 60W-R endpoint for the Badger ADE register or a 60WP-R for the RTR register. Both endpoints have three wires: (1) wire with brown insulation (2) wire with yellow insulation (3) wire with gray insulation Note Fold the unused yellow wire up into the housing. 2.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints 3. Place the endpoint on the register, ensuring the edge of the endpoint housing is seated properly around the perimeter of the register as shown below. Note A gasket is not required. 4. Install four Torx-head mounting screws (Itron part number SCR-0010-005) as shown below and hand tighten the screws.
Direct-Mount Register Mounting 5. If you have not already done so, connect the register to the water meter and fully tighten the mounting screw (1) as directed by Badger Meter. Note The register can be installed on the meter in four different positions with respect to the direction of water flow (refer to the directions that come with the meter or register). 6. If the standard Torx screw is used (1), a wire seal is not necessary.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints To install the Elster/AMCO (ABB) Scancoder, InVISION, or Digital DirectMount Caution Ensure you have an Elster/AMCO meter with a register designed for direct mounting. Check the part number on the endpoint label to make sure it corresponds to the meter register. Always install the endpoint right side up with the arrow on the housing pointed upward. Note The register may or may not be mounted on the meter when performing the following steps. 1.
Direct-Mount Register Mounting 2. Obtain a 60W-R if connecting to an InVISION or Scancoder register. Obtain a 60WP-R if connecting to a Digital register. 3. Strip 1/2-inch of insulation from the end of the brown, gray, and yellow wires. 4. Place the endpoint on the mounting bracket and route yellow, gray, and brown wires through the opening as shown below. Note A gasket is not required.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints 5. Install four Torx-head mounting screws (Itron Part Number SCR-0010-005) as shown below. Hand tighten each screw. 6. For Scancoder and InVISION registers connect the gray wire under the left register screw head (1), the brown wire under the center register screw (2), and the yellow wire under the right register screw head (3). Ensure all screws are tightened securely.
Direct-Mount Register Mounting 7. Install the endpoint and mounting bracket on the meter register adapter collar (1). 8. Replace the hollow pin (1) you removed in step 1. The meter and endpoint assembly should now look like this (see below).
Chapter 2 Installing the 60W-R and 60WP-R Endpoints Connecting the 60W-R and 60WP-R Endpoints This section contains information about wiring the 60W-R and 60WP-R Endpoints to the water meter. To connect the 60W-R cable to the register 1. Initialize the endpoint by referring to the section titled: 60W-R Startup Sequence (see page 2). Caution If you simply connect the 60W-R to the meter register, the endpoint might not activate.
Connecting the 60W-R and 60WP-R Endpoints To connect the 60W-R to the Neptune ARB V or ProRead register-mount Caution Ensure you have a Neptune ARB V or ProRead meter. Check the part number on the endpoint to make sure it corresponds to the meter register Note Neptune's ProRead register must be programmed with a Neptune ProRead Programmer as 3-wire to work properly with the 60W-R. Neptune ARB V registers are not programmable. 1.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints 2. Obtain a 60W-R Neptune ARB V endpoint if connecting to an ARB V register or a 60W-R endpoint if connecting to a ProRead register. 3. Strip 1/2-inch of insulation from the end of the endpoint's gray, yellow, and brown wires. 4. Connect the cable wires from the endpoint to the register screw terminals as shown below. Connect the gray cable wire to the top (1) screw. Connect the yellow cable wire to the middle (2) screw.
Connecting the 60W-R and 60WP-R Endpoints 5. Put the wire terminal enclosure cover back on the register (see below). 6. Place the endpoint on the mounting bracket as shown below, with the wires exiting from the notch in the bracket (1). 7. Attach the endpoint mounting cover using four Torx-head mounting screws (Itron Part Number SCR-0010-005) as shown below. Hand tighten each screw. Ensure the wires are not pinched between the cover and the endpoint housing.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints To connect the Sensus ECR or ICE register Caution Ensure you have a Sensus ECR or ICE with accessible screw terminals. Check the part number on the endpoint to make sure it matches the meter. Note The register may or may not be mounted on the meter when performing the following steps. 1. To remove the cable entrance cover from the meter register, turn it counterclockwise approximately 1/4 turn.
Connecting the 60W-R and 60WP-R Endpoints 2. Obtain a 60W-R for the Sensus ECR or ICE registers. 3. Strip 1/2-inch of insulation from the end of the brown, gray, and yellow wires. 4. Install the yellow wire from the endpoint under the register screw head marked "B" on the top of the register. Tighten the screw fully. Install the gray wire under the register screw head marked "R" on the top of the register. Tighten the screw fully.
Chapter 2 Installing the 60W-R and 60WP-R Endpoints Caution Be sure to install the wires around the screws in a clockwise direction, as shown or the wires may come out from under the screw heads as you tighten them. Also, make sure no insulation is compressed under the screw head, or the wire might not make good contact. 5. To reinstall the cable bracket on the meter register, place it over the wires, push down and turn clockwise until it lines up as shown below. 6.
Connecting the 60W-R and 60WP-R Endpoints 7. Attach the endpoint mounting cover using four Torx-head mounting screws (Itron Part Number SCR-0010-005) as shown below. Hand tighten each screw. Ensure the wires are not pinched between the cover and the endpoint housing.
Chapter 2 32 Installing the 60W-R and 60WP-R Endpoints 60W-R and 60WP-R Endpoints Installation Guide
CHAPTER 3 Programming and Verifying 60WP-R Operation To program the endpoint, you must first activate the programming mode and then program the endpoint using an FC200SR handheld radio. Activating 60WP-R Programming Mode Use the programming magnet pen (Itron part number MLD-0175-001) to place the endpoint into programming mode. Place the magnet pen in the small indentation on the front of the endpoint housing (see below) and hold it for approximately three seconds.
Chapter 3 Programming and Verifying 60WP-R Operation Programming the 60WP-R To program a 60WP-R, use an FC200SR handheld running Endpoint-Link or EndpointLink Pro software and your utility's programming configuration file. Using the handheld, enter the endpoint ID, select the endpoint type (60WP-R), select the correct meter configuration, select the length of the cable, and then enter in the initial reading from the register.
APPENDIX A Appendix A 1. Push the wires that are to be connected together as far as possible into the connector. Caution Do not strip any insulation from the ends of the wires before you push them into the connector. 2. Placed the connector (with wires) into the jaws of the crimping tool. 3. Crimp the connector by squeezing the handles until the connector looks like this (see below). Continue to apply pressure for three seconds. 4.
Appendix A Appendix A Then squeeze the crimping tool handle until it pushes the connector (now crimped out of the tool when you release the handle. A connector is crimped properly if the top of the movable, yellow center part (1) is flush with the top of the connector body (2) (see below). Warning Crimping the connectors sometimes squeezes some sealant (see below) out of them. The sealant protects the inside of the connector against insects, moisture, and other contaminants.