Installation Guide

Table Of Contents
Quantity Description GE Dresser part number
Important: The GE Oil and Gas mounting bracket kit does not include the cable required to connect
the remote module to the Amphenal connector on the IMC\W2.
Completing the Bracket Installation
1. Insert the 8-32 x 7/16-inch screw (1) into the top of
the mounting bracket. Insert the two 8-32 x 3/4-inch
screws (2) into the bottom of the mounting bracket.
2. Insert one 3/32-inch nut on the top 7/16-inch bracket
screw. Slide the 500G ERT remote module mounting
lug over the top of the bracket screw and nut.
3. Secure the bottom 500G ERT remote module mount-
ing holes over the two 8-32 x 3/4-inch screws with the
remaining two 8-32 nuts.
4. Insert the #10 spacers into the four mounting holes
on the back of the IMC\W2.
25 July 2019 TDC-1678-005 46
500GERT®Module Installation Guide, RemoteMount Chapter 5 Specific Meter Manufacturer Installation