Installation Guide
Table Of Contents
- Cellular 500G Module Remote Installation Guide
- Contents
- New in This Document
- 1 Important Safety and Compliance Information
- U.S. and Canadian Patent Numbers
- USA, FCC Part 15 Spectrum Compliance
- Modifications, Repairs, Installation, and Removal
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Transportation Classification
- Lithium Battery Safety
- Equipment Repairs
- Intrinsic Safety
- Electrostatic Ignition Hazard
- Module Cleaning
- Do Not Drop
- 2 About the Itron Cellular 500G Remote Module
- 3 Mounting
- 4 Programming
- 5 Specific Meter Manufacturer Installation
- 6 Diaphragm Meter Installation
- 7 Using Gel-cap Connectors to Complete Wiring Connections
- 8 Optional Sealant Application Instructions
Cable
pin
module wire
Correct Uncorrected Aux CC
3 White and blue
4 Red
5 Red
6 White and
blue
4. After the wire connections are completed, install a cable tie to the meter cable just below the
exposed colored lead wires on the cable insulation.
5. Remove the excess cable tie using a hand-held
side-cutter pliers. The cable tie performs as a
cable strain relief to mitigate the risk of destructive
tension on the lead wires.
6. Tuck the three gel connectors and cable tie inside the module housing, as shown in the following
placement illustration and schematic.
7. Install the remote module backplate using the four screws previously removed from the module and a Torx
T-10 screwdriver.
Cellular 500G Module Remote Installation Guide 5 Specific Meter Manufacturer Installation
10 March 2021 815-0622-00 REV 000 Itron, Inc. Page 74 of 91