Installation Guide
Table Of Contents
- Cellular 500G Module Remote Installation Guide
- Contents
- New in This Document
- 1 Important Safety and Compliance Information
- U.S. and Canadian Patent Numbers
- USA, FCC Part 15 Spectrum Compliance
- Modifications, Repairs, Installation, and Removal
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Transportation Classification
- Lithium Battery Safety
- Equipment Repairs
- Intrinsic Safety
- Electrostatic Ignition Hazard
- Module Cleaning
- Do Not Drop
- 2 About the Itron Cellular 500G Remote Module
- 3 Mounting
- 4 Programming
- 5 Specific Meter Manufacturer Installation
- 6 Diaphragm Meter Installation
- 7 Using Gel-cap Connectors to Complete Wiring Connections
- 8 Optional Sealant Application Instructions
15. Install the bottom two mounting screws and Kep
nuts. Tighten the three mounting screws in an
alternating pattern.
16. Install the supplied red tamper seals over the
bottom mounting screws on the remote module.
GE Oil and Gas Meters With Pulse Output Wiring
These instructions describe B3 series, LMMA series, IMC, IMC/W2, MC2, and Series ES3 and
ETC wiring connections. Installations are similar in their wiring of a meter manufacturer cable to
the module that is then connected to the index or instrument.
Note: Wiring connections are different for the models as described. Use the connections for
your specific meter model.
1. Remove the backplate (4 screws) from the
module and expose the module lead wires. The
backplate and screws will be re-installed on the
module later in this procedure, so store them
(temporarily) in a safe, secure place.
2. Insert the lead wires from the module and the
correct GE pulse output wire into new 3M gel
connectors (Itron part number CON-0023-001) and
crimp using a 3M hand-held crimping tool.
Cellular 500G Module Remote Installation Guide 5 Specific Meter Manufacturer Installation
10 March 2021 815-0622-00 REV 000 Itron, Inc. Page 50 of 91