Installation Guide
Table Of Contents
- Cellular 500G Module Remote Installation Guide
- Contents
- New in This Document
- 1 Important Safety and Compliance Information
- U.S. and Canadian Patent Numbers
- USA, FCC Part 15 Spectrum Compliance
- Modifications, Repairs, Installation, and Removal
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Transportation Classification
- Lithium Battery Safety
- Equipment Repairs
- Intrinsic Safety
- Electrostatic Ignition Hazard
- Module Cleaning
- Do Not Drop
- 2 About the Itron Cellular 500G Remote Module
- 3 Mounting
- 4 Programming
- 5 Specific Meter Manufacturer Installation
- 6 Diaphragm Meter Installation
- 7 Using Gel-cap Connectors to Complete Wiring Connections
- 8 Optional Sealant Application Instructions
7. Carefully push the connectors and wires into the meter tower housing.
8. Lubricate the O-ring with O-ring lubricant and install the O-ring on the adapter plate. Insert the adapter
plate into the tower and tighten the two 5 mm screws.
Elster American Mechanical and Wiring Installation Instructions
Note: Connection to an Elster American meter requires a cable interface compatible to an
Elster American RPM rotary meter.
1. Trim the remote module wires to 3.5 inches.
2. Carefully strip the insulation covering from the meter cable (purchased from the meter manufacturer)
approximately 1-1/2-inches from the end.
Caution: Do not cut through the individual wire insulation.
3. Separate the meter cable's black, white, and red wires for connection to the remote module. Cut off the
unused wires even with the outer covering (insulation).
Cellular 500G Module Remote Installation Guide 5 Specific Meter Manufacturer Installation
10 March 2021 815-0622-00 REV 000 Itron, Inc. Page 37 of 91