Installation Guide
Table Of Contents
- Cellular 500G Module Remote Installation Guide
- Contents
- New in This Document
- 1 Important Safety and Compliance Information
- U.S. and Canadian Patent Numbers
- USA, FCC Part 15 Spectrum Compliance
- Modifications, Repairs, Installation, and Removal
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Transportation Classification
- Lithium Battery Safety
- Equipment Repairs
- Intrinsic Safety
- Electrostatic Ignition Hazard
- Module Cleaning
- Do Not Drop
- 2 About the Itron Cellular 500G Remote Module
- 3 Mounting
- 4 Programming
- 5 Specific Meter Manufacturer Installation
- 6 Diaphragm Meter Installation
- 7 Using Gel-cap Connectors to Complete Wiring Connections
- 8 Optional Sealant Application Instructions
2. Insert tamper seals into the tamper seal mounting
cups on the remote modules.
3. With the corrector facing forward, align the corrector mounting holes with the index drive mounting holes.
4. Insert the corrector's mounting screws in the front corrector and index mounting holes. Loosely tighten the
front two mounting screws.
5. Align the inside mounting rail screw holes over the back index and corrector mounting screw holes.
6. Insert the two remaining mounting screws in the corrector bracket mounting holes.
7. Tighten all four mounting screws.
Eagle Research Mechanical and Wiring Installation Instructions
This section provides wiring and connection information for compatible Eagle Research
products. Refer to the instruction for your product type.
Connecting to the MPplus Corrector
1. With the MPplus door open, insert the flying leads from the remote module into the compression connector
on the left of the MPplus housing.
2. Pull the lead wires through the compression connector until there is adequate wire to reach the terminal
blocks labeled 15, 16, 17, 18, 19, 20, 21, and 22.
3. Tighten the compression connector.
4. Twist the remote module's blue and white wires together.
For uncorrected reads:
5. Connect:
■ the twisted blue and white wires to terminal 17 on the
MPplus terminal block.
■ the red remote module wire to terminal 18 on the
MPplus terminal block.
Cellular 500G Module Remote Installation Guide 5 Specific Meter Manufacturer Installation
10 March 2021 815-0622-00 REV 000 Itron, Inc. Page 28 of 91