Installation Guide
Table Of Contents
- Cellular 500G Module Remote Mount Installation Guide
- Contents
- New in This Document
- 1 Introduction
- 2 Mounting
- 3 Programming
- 4 Specific Meter Manufacturer Installation
- 5 Using Gel-cap Connectors to Complete Wiring Connections
- 6 Optional Sealant Application Instructions
- A Important Safety and Compliance Information
- U.S. and Canadian Patent Numbers
- USA, FCC Part 15 Spectrum Compliance
- Modifications, Repairs, Installation, and Removal
- Canada, ISED Spectrum Compliance
- RF Exposure (FCC/ISED)
- Transportation Classification
- Lithium Battery Safety
- Equipment Repairs
- Intrinsic Safety
- Electrostatic Ignition Hazard
- Module Cleaning
- Do Not Drop
–
Custom GE Dresser mounting
•
D800/D1000 mounting solution requires the following materials
•
(1) 8-32 by 1/2 inch screw
•
(2) 8-32 by 1/2 inch screws
•
(3) 8-32 inch Kep nuts
5. Programming the Cellular 500G. Programming requires an Itron programming device (for
example, an FC300SR). For programming information, see Programming on page 18.
Cellular 500G configuration with the meter is dependent on your system application. See
the GE Dresser meter product documentation for configuration information.
Custom Mounting Options
Specific product mounting instructions for GE D800/D1000 meters are included in the
D800/D1000 installation section.
GE Oil and Gas ES3 or ETC Ordered with the AMR-ready Mounting Kit
1. Score (cut) the cable jacket surrounding the ES3 or ETC wires and carefully remove the
cable jacket to expose the ES3 or ETC wires.
2. Connect the wires to the module. For more information, see GE Oil and Gas Meters With
Pulse Output Wiring on page 60.
3. Align the module mounting holes with the ES3 or ETC bracket mounting holes. Use a T15
Torx screwdriver to insert and tighten the mounting screws. Tighten the screws in an
alternating pattern.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation
October 11, 2021 815-0622-00 REV 000 Itron, Inc. Page 53 of 99
DRAFT