Cellular 500G Module Remote Mount Installation Guide xx DRAFT xx ITRON INSTALLATION GUIDE October 11, 2021 815-0622-00 REV 000 Itron, Inc.
Cellular 500G Module Remote Mount Installation Guide October 11, 2021 815-0622-00 Copyright © 2021 Itron, Inc. All rights reserved. Confidentiality Notice Confidential Information of Itron®, Inc., provided under nondisclosure obligations. The information contained herein is proprietary and confidential and is being provided subject to the condition that (i) it be held in confidence except to the extent required otherwise by law and (ii) it will be used only for the purposes described herein.
Contents Cellular 500G Module Remote Mount Installation Guide 1 Contents 3 New in This Document 6 1 Introduction 7 Related Documents 7 Security 7 Transmission Modes 8 Mobile High Power Mode 8 Mobile and Handheld Mode 8 (Optional) Hard to Read Mode 9 9 Highlighted Features 2 Gas Day Take 9 High Flow Event/Alarm 9 Local Auditing 10 Low Battery Event/Alarm 10 Functional Specifications 10 Operational Specifications 11 Firmware Functionality 11 Mounting 12 Standard Installa
Cellular 500G Module Remote Mount Installation Guide 4 Table of Contents Field Collection System (FCS) (Mobile Mode Only) 22 OpenWay Collection Manager (OWCM) 22 Itron Enterprise Edition (IEE) Meter Data Management 22 Specific Meter Manufacturer Installation 23 Diaphragm Meter Installation 23 Overview 23 Module Mounting 25 Mechanical and Wiring Installation Instructions 25 Programming and Requirements Notes 32 Eagle Research Meter Installation 33 Overview 34 Mounting Instructions 3
Cellular 500G Module Remote Mount Installation Guide Table of Contents Romet Meter Installation 78 Overview 78 Mounting Instructions 79 Mechanical and Wiring Installation Instructions 81 Programming and Requirements Notes 86 89 Sensus Meter Installation Overview 89 Mounting Instructions 89 Mechanical and Wiring Installation Instructions 91 Programming and Requirements Notes 91 5 Using Gel-cap Connectors to Complete Wiring Connections 92 6 Optional Sealant Application Instructions 94
Cellular 500G Module Remote Mount Installation Guide Table of Contents New in This Document Revision REV 000 Date Description March 2021 First date of publication. DRAFT October 11, 2021 815-0622-00 REV 000 Itron, Inc.
1 Introduction Itron’s Remote Mount Cellular 500G Modules (hereafter referred to as Cellular 500G) are IPV4/IPv6 open standards-based gas modules designed to be read under Itron’s multipurpose Network Mode or by legacy Mobile Mode. In Network Mode. The Cellular 500G offers firmware download, sub-hourly interval data, and extended data storage. In Mobile Mode. The Cellular 500G operates identically to the 100G DLS Dataglogging Remote Module.
Cellular 500G Module Remote Mount Installation Guide 1 Introduction ■ Authentication. Authentication is the process of confirming that an artifact is genuine or valid. Authentication in the module is the process of verifying a request is from a valid source and in its original form. ■ Encryption. Encryption is the process of transforming information to make it unreadable to anyone who does not have a valid security key. There are two types of encryption, symmetric and asymmetric.
Cellular 500G Module Remote Mount Installation Guide 1 Introduction (Optional) Hard to Read Mode The module transmits a high-powered RF message every 30 seconds. In Hard to Read Mode, the expected battery life decreases to 15 years in this mode. The hard to read mobile mode should only be used for exceptionally hard-to-read applications (such as meters installed on rooftops or in sub-basements).
Cellular 500G Module Remote Mount Installation Guide 1 Introduction Local Auditing Note: Local auditing functionality is dependent on the module’s firmware version. For more information, see Firmware Functionality on page 11. The Cellular 500G supports local data auditing of installation programming. Local auditing features the listed characteristics. ■ Supports writing data (in both manufacturing and by FDM) to the module to support future installation programming auditing.
Cellular 500G Module Remote Mount Installation Guide Functional specification 1 Introduction Description ■ The Cellular modem is a Sierra Wireless HL7800 module. – IC: 2417C-HL78 Measurement Canada: Pending Intrinsically safe per Telemetering Equipment for use in Hazardous Locations, for Cl I, Div 1, Gp D for Haz Loc, Temp Code T1, -40°C ≤ Ta ≤ +70°C. Operational All Cellular 500Gs operate pursuant to FCC, ISED cellular licensing, and 3GPP defined, regulated cellular standards and networks.
2 Mounting This chapter provides the instructions to mount the Cellular 500G on a pipe or other flat vertical surface (wall). Standard Installation Options Mount the Cellular 500G using the pipe mount or wall mount (flat vertical surface) procedure. ■ Pipe mount. Itron offers a pipe installation kit (CFG-0005-003) to mount the Cellular 500G on a pipe. ■ Flat vertical (wall) mount. Installation using the wall mount option places the module on a wall or other vertical surface.
Cellular 500G Module Remote Mount Installation Guide Itron part number CFG-0005-003 2 Mounting Description Pipe mount kit contents: ■ 2 band clamps ■ 2 tamper seals ■ 1 pipe bracket ■ 2 cable ties ■ 1 adapter plate ■ the following screws: 1. SCR-0215-001 (2) #8-16 by 1/2 inch slotted pan-head tapping screw, corrosion-resistant steel. Attaches the adapter plate to the pipe bracket. 2. SCR-0215-002 (2) #8-16 by 1 inch slotted pan-head tapping screw, corrosion-resistant steel.
Cellular 500G Module Remote Mount Installation Guide 2 Mounting Push the end of the band through the band clamp screw assembly. Turn the band clamp’s screw assembly to fit into the pipe bracket opening. Tighten the clamp screw until the band clamp is secure on the pipe. 5. Place the adapter plate on the pipe bracket with the mounting lug at the top. The adapter plate screw bosses fit into the pipe bracket recess. 6.
Cellular 500G Module Remote Mount Installation Guide 2 Mounting 10. Insert the tamper seals. 11. Gather the excess module cabling into a loop and use the cable tie to secure the gathered cable to the pipe. Adapter Plate Mounting Positions Note: The notch at the top of the adapter plate (1) must always be at the top position. The following illustrations show the various mounting configurations. The adapter plate mounting screw locations are indicated (2).
Cellular 500G Module Remote Mount Installation Guide 2 Mounting Selecting and Installing On a Wall or Flat Vertical Mounting Location Carefully select a mounting location free from electrical wires. The mounting location must have the proper clearance to accommodate the 1.5 inch module mounting screws so nothing is damaged by the drill or mounting screws. Use a compatible mounting screw. 1. Drill three pilot holes in the mounting surface.
Cellular 500G Module Remote Mount Installation Guide 2 Mounting 5. Secure any excess module cabling with a cable tie. DRAFT October 11, 2021 815-0622-00 REV 000 Itron, Inc.
3 Programming Caution: You must program the module before use. Programming Itron modules requires an understanding of: ■ Your meter’s drive rate and the number of dials – ■ The drive rate and number of dials is important for programming the module to count correctly and roll over to zero at the correct time. For example, a four-dial, two cubic feet meter configuration will count two cubic-feet for each rotation and roll over to zero after 9999.99 where the ones place is equivalent to 100 cubic-feet.
Cellular 500G Module Remote Mount Installation Guide 3 Programming 1. Verify that you have the correct programming mode (Network Mode or Mobile Mode [mobile high power mode, mobile/handheld mode, or hard-to-read mode]) for your application. 2. For all programming and Check Endpoint operations using a handheld computer, hold the handheld as close to vertical as possible. For best success, keep the handheld within six feet of the target module. 3.
Cellular 500G Module Remote Mount Installation Guide 3 Programming DRAFT October 11, 2021 815-0622-00 REV 000 Itron, Inc.
Cellular 500G Module Remote Mount Installation Guide 3 Programming Programming Example Endpoint programmed for 6 dial, 1000 cubic feet (CCF). 1. Enter the initial index read. For this example, the initial read is 123456 where 6 = 600 cubic feet. After the initial programming, an endpoint read will result in a reading of 1234560 where the least significant digit is in 10’s of cubic feet.
Cellular 500G Module Remote Mount Installation Guide 3 Programming Check Endpoint Functions The FDM Check Endpoint function triggers users to input the number of dials and drive rate if a Check Endpoint is requested for an endpoint programmed for 5, 6, or 7-dial meter configurations. The request to input the dial and drive rate information happens only if the system has more than one option using the same count rate and rollover variable enabled in their FDM business unit.
4 Specific Meter Manufacturer Installation This chapter provides the instructions to install the Cellular 500G to compatible meters. Reference each section for compatible meters. Diaphragm Meter Installation This chapter provides the instructions to install Cellular 500Gs (Itron part number ERG-7000501 with 2.5 foot cable and encoder) on diaphragm gas meters where a direct mount module is not possible.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 3. Connecting the Cellular 500G to the diaphragm meter. The following materials are required for each Cellular 500G installation to a diaphragm gas meter. Purchase these items from Itron. Part Number Description ERG-7000-501 Cellular 500G with 2.5 foot encoder cable CFG-0081-001 Remote mount encoder kit 013-1723-112 1. Acetone applicator stick 2. Tamper seals 3. Cable ties 4. Mounting screws 5.
Cellular 500G Module Remote Mount Installation Guide 4-hole front cover gasket: Itron part number FAB-0014-003 4 Specific Meter Manufacturer Installation 2-hole front cover gasket: 1-hole front cover gasket: Itron part number FAB-0014-002 Itron part number FAB-0014-001 Module Mounting For Cellular 500G mounting with the diaphragm meter, see Mounting on page 12.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 2. Remove the old gasket and any gasket residue from the meter and index cover. 3. Remove the magnet hub from the encoder installation kit (Itron part number CFG-0081001). Verify that there is only one magnet in the hub. Note: If there is no magnet or if there are two magnets in the magnet hub, discard the hub. Encoder installation requires a magnet hub with one magnet. 4.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 5. Remove the magnet hub from the encoder and set it at least one inch away from the encoder. 6. Use a module programming device to read the Cellular 500G. If this reading is higher than the reading taken after the index was removed, the remote is counting and working properly. Note: It the reading is not higher than the previous reading, the Cellular 500G is not working properly. Repeat steps 5 and 6.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 10. Press the magnet hub down over the hub spacer as far as possible. The bottom of the hub spacer may touch the index face. Turn the dial after magnet hub installation to verify that the index dial functions with a smooth, easy rotation. 11.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Note: If a TEMP COMP sticker is attached to the index where the encoder cable will mount, remove it before cleaning with the acetone stick. If the sticker (or replacement sticker) must be put back on the register face, place it in a new location on the index face after the encoder is attached. 13. Tilt the acetone stick vertically with the applicator foam end down.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation moderate pressure, hold the encoder firmly against the index, without moving, for 15 seconds to permanently apply the encoder. 17. Remove the encoder spacing tool and lay the index on a flat, horizontal surface to reduce strain on the encoder cable. 18. Program the index reading (with the encoder mounted) into the Cellular 500G.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 21. Install a strain-relief cable tie about 1.25 inches from the encoder cable’s stripped end. The cable tie must be inside the index cover after the cover is installed on the meter. Remove any excess cable tie with side-cutting pliers and dispose of the excess cable tie. 22. Remove the protective backing on the replacement gasket to expose the adhesive side of the gasket.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 24. Verify that the encoder cable is in the correct position in the cable slot of the gasket. Fully tighten the screws in an alternating pattern. Install utility-approved security seals and wires as required. Programming and Requirements Notes For Cellular 500G programming, see Programming on page 18. Residential Module Programming Notes The module is programmed based on the meter’s drive rate.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Commercial Module Programming Notes Take note of the index drive rate shown on the index. This is programmed based on the drive rate. Elster American commercial meter index drive rates may be 5, 10 or 100 cubic feeto the index shown has a 10 cubic foot drive rate.
Cellular 500G Module Remote Mount Installation Guide Meter model 4 Specific Meter Manufacturer Installation Meter notes Pulse width: 70 mS and 50 mS off timing Itron part number ERG-7000-502 Pulse output board required MPplus volume corrector Pulse width: 70 mS on and 500 mS off timing Corrector must have Solid State relays XARTU-1 volume corrector Overview Installing the Cellular 500G to an Eagle Research volume corrector involves four tasks. 1.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 4. Programming the Cellular 500G. Programming requires an Itron programming device (for example, an FC300SR). For programming information, see Programming on page 18. Cellular 500G configuration with the meter is dependent on your system application. See the Eagle Research meter product documentation for the Eagle Research Field Manager database configuration information.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 5. Align the inside mounting rail screw holes over the back index and corrector mounting screw holes. 6. Insert the two remaining mounting screws in the corrector bracket mounting holes. 7. Tighten all four mounting screws. Mechanical and Wiring Installation Instructions This section provides wiring and connection information for compatible Eagle Research products.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation For corrected reads 7. Connect the twisted blue and white wires to terminal 15 on the MPplus terminal block. 8. Connect the red Cellular 500G wire to terminal 16 on the MPplus terminal block. 9. Close and latch the MPplus corrector door. Connecting to the XARTU Corrector For XARTU-1 uncorrected reads 1.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 3. Tighten the compression connector. 4. Connect the red Cellular 500G wire to pin 4 of the K2 terminal port. 5. Twist the Cellular 500G’s blue and white wires together and connect the twisted blue and white wires to pin 5 of the K2 terminal port. 6. Plug the MTA battery connector from the battery pack into the VBAT1 connector to supply power to the XARTU-1 corrector. 7. Close and latch the corrector door.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 6. Connect the twisted blue and white wires to terminal 2 on the K1 terminal port. Programming and Requirements Notes Important! This information is subject to change without notice. Refer to the Eagle Research product documentation to verify the most current programming and configuration information for the Cellular 500G.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Using Eagle Research Field Manager to Change the MPplus Settings 1. Open the Eagle Research Field Manager from the Start menu or the desktop shortcut. 2. Connect the communications cable from your computer into the MS connector on the side of the MPplus corrector. After the MS connector is connected, take note of the baud rate displayed on the front of the corrector. 3.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 7. Click the Setup Parameters tab at the bottom of the parameters window. A parameters window opens. 8. Enable POut 5 (17, 18). 9. Set the additional parameters as required in the Uncorrected Pulse Output Setup at the lower right of the window. 10. If your software does not have an option to use POut for the uncorrected pulse output, contact Eagle Research to get the correct software version. 11.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Using Eagle Research Field Manager to Change the XARTU Corrector Settings 1. Open the Eagle Research Field Manager from the Start menu or the desktop shortcut. 2. Click Connect on the upper left corner of the Field Manager window. 3. Select the following parameters: – Connection Type: Direct – Communications Port: Enter your computer’s port number.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 8. Enable K2 (4, 5, 6) and set additional parameters are required in the Uncorrected Pulse Output Setup section in the lower right of the window. 9. Set the Primary Pulse Output to Enable K1 (1, 2, 3) and the Optional Pulse Output to Disable (unless it is used for another application) in the Corrected Pulse Output Setup section in the lower left of the window. 10. Click Send All Changes. 11.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Elster American Meter Installation Some meter manufacturers provide mounting kits and installation procedures for their meters. If the Elster American RPM meter to the Cellular 500G installation instructions are not available, follow the installation procedures in this section.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Mounting Instructions 1. Remove the meter’s top plate by removing the two 5 mm screws and carefully prying up on the plate. The plate is secured with an O-ring seal. Remove the O-ring from the plate. Caution: If the O-ring is damaged during removal, obtain a replacement from Elster American Meter Co. 2. Look into the meter tower and find the meter switch lead and connector (4-pin). 3.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Note: Save any meter tags. You will re-install them later in the installation process. 5. If you removed the register cover, replace the cover using the four 5 mm mounting screws. 6. Attach the 4-pin male connector on the Elster American Meter adapter plate to the 4-pin female connector inside the meter’s tower. The connectors slide together and latch. 7.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 8. Lubricate the O-ring with O-ring lubricant and install the O-ring on the adapter plate. Insert the adapter plate into the tower and tighten the two 5 mm screws. Mechanical and Wiring Installation Instructions Note: Connection to an Elster American meter requires a cable interface compatible to an Elster American RPM rotary meter. 1. Trim the Cellular 500G wires to 3.5 inches. 2.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Important! Use a crimping tool compatible with gel-connectors. Do not use standard pliers for crimping gel-connects. For more information, see Using Gelcap Connectors to Complete Wiring Connections on page 92. American meter wire Cellular 500G wire Black Blue White White Red Red 5. Insert the meter cable through the slot on the Cellular 500G backplate.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Important! Verify that the cable tie and gel connectors are inside the module housing and that the cable extends out of the slot in the backplate. Torque the backplate mounting screws to 9 to 12 inch-pounds. Installing the Cellular 500G Cable 1. Insert the plug on the cable connected to the module into the receptacle on the meter adapter plate. 2.
Cellular 500G Module Remote Mount Installation Guide Meter model 4 Specific Meter Manufacturer Installation Meter notes Must select two pulses/second from pulse output on the output frequency menu. Itron part number ERG-7000-503 Module notes Module cut cable requires customersupplied cable capable of terminating the module white and blue wires at the meter interface. GasMicro Electronic Volume Corrector Overview Installing the Cellular 500G to a Galvanic volume corrector involves four tasks. 1.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation GAS Micro wiring connections GAS Micro corrector P13 connection Pulse output2-E C3 Pulse output2-C C4 100G Module wires Programming Notes For more information about programming the Galvanic Gas Micro Electronic volume corrector, see the GAS MICRO Operator’s Manual, Galvanic part number MA1956. Contact Galvanic Applied Sciences, Inc. to obtain the operator’s manual.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Meter model Meter notes Itron part number Module notes Integral Micro Corrector MC2 Pulse width must be set greater than 100 ms. Firmware version 1.71 or earlier. ERG-7000-503 ERG-7000-505 Both modules are compatible with this meter model. Series 3 ES3 meter Electronic Temperature Compensator (ETC) Overview Installing the Cellular 500G to a GE Dresser meter involves the following tasks. 1.
Cellular 500G Module Remote Mount Installation Guide – 4 Specific Meter Manufacturer Installation Custom GE Dresser mounting • D800/D1000 mounting solution requires the following materials • (1) 8-32 by 1/2 inch screw • (2) 8-32 by 1/2 inch screws • (3) 8-32 inch Kep nuts 5. Programming the Cellular 500G. Programming requires an Itron programming device (for example, an FC300SR). For programming information, see Programming on page 18.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Caution: Upright vertical positioning is critical because: ■ The 500G series modules are optimized for communication and require upright mounting. Any other mounting position could result in reduced RF performance. ■ The Cellular 500G tilt tamper sensor requires upright mounting. Any other mounting position may cause issues with the module’s tilt tamper detection.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 3. Secure the bottom Cellular 500G mounting holes over the two 8-32 by 3/4 inch screws with the remaining two 8-32 nuts. 4. Insert the #10 spacers into the four mounting holes on the back of the IMC\W2.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 6. Connect the cable to the pulse output on the IMC/W2 or MC2. Mechanical and Wiring Installation Instructions This section describes mechanical installation to the GE Oil and Gas meter and wiring connections. D800/D1000 Wiring and Installation 1. Loosen and remove the two screws holding the mounting brackets to the meter. 2. After the brackets are removed, the pulse output cable is visible.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 3. Loosen the cable gland and pull the cable out until it extends 7.5 to 8 inches out of the cable gland. 4. Tighten the cable gland. Do not use pliers or a wrench to tighten the cable gland. 5. Rotate one bracket. Route the meter cable through the holes located at the bend of the mounting brackets. 6. Attach the brackets to the meter using the previously removed screws.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 7. Splice the meter pulse output wires to the module wires using gel cap connectors. Follow the wire connections for the D800/D1000 to module wire connections below. Note: Use a crimping tool compatible with gel-connectors. Details on using the crimping tool are included in the mounting installation section of this document.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 11. Install the four back plate screws using the T-15 Torx screws supplied with the module. 12. Route the cable through the channel in the backplate standoffs. 13. Insert the 8-32 by 1/2 inch screw into the top hole in the meter mounting bracket and thread one of the Kep nuts loosely onto the end of the screw. 14.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 16. Install the supplied red tamper seals over the bottom mounting screws on the Cellular 500G. GE Oil and Gas Meters With Pulse Output Wiring These instructions describe B3 series, LMMA series, IMC, IMC/W2, MC2, and Series ES3 and ETC wiring connections. Installations are similar in their wiring of a meter manufacturer cable to the module that is then connected to the index or instrument.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Note: Use a crimping tool compatible with gel-connectors. For information about crimping the connections, see Using Gel-cap Connectors to Complete Wiring Connections on page 92. The same process is used for wiring cables to the module. Each meter or cable may have different wire colors and wiring instructions. See the specific wiring configuration for your product.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 2. To receive corrected reads, connect the red wire to the GND 2/3 (ground) TB3 telemetry output position (C). Connect the white and blue wires to the pulse output 2 position. 3. After completing the wiring connections, install a cable tie to the meter cable just below the exposed colored lead wires on the cable insulation. Remove the excess cable tie using hand-held side-cutter pliers.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 5. Install the Cellular 500G backplate using the four screws previously removed from the module and a Torx T-10 screwdriver. 6. Plug the cable into the pulse output of the index. Important! Verify that the cable tie and gel connectors are inside the module housing and that the cable extends out of the backplate slot. Torque the backplate mounting screws 9 to 12 inch-pounds. 7.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 4. If you change a variable, click Update Values to complete the change. 5. Select the Configuration tab to view the volume configuration or confirm the volume configuration and pulse settings. Use the drop-down lists to change the variable’s setting. Note: You must click OK to complete any setting changes. Testing IMC or W2 Communication with GE User Terminal (UT) Communication Software 1.
Cellular 500G Module Remote Mount Installation Guide Meter model 4 Specific Meter Manufacturer Installation Meter notes Module type Itron part number Module notes Pressure and temperature electronic volume instruments. Instruments must have a Form A board. 500G remote ERG-7000-502 Meter notes Module type Itron part number module notes Temperature Compensating Index. TCI must have a Form A board, Form C is NOT supported. Item #56 Pulse Scaling Factor must be 2.0.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 1. Programming the instrument and verifying that the Honeywell instrument is set up to work with the Cellular 500G. Programming requires Honeywell software. Reference Honeywell product and software documentation for the correct software and version requirements. 2. Installing the instrument and any required retrofit components. 3. Mounting the Cellular 500G to a pipe or flat vertical surface.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Warning! The battery pack, main board, and switchboard may be damaged if left in the Honeywell Instrument volume corrector while completing this installation. 5. Drill two 3/16 inch holes in the back of the Mini-Max enclosure as specified by the information included in the kit. Remove any metal shavings from the enclosure. 6.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Note: Aligning the second bracket threaded hole and drilled hole may require some manipulation of the mounting bracket. 11. Insert the module cables (both units) through the large cable strain relief on the left rear of the instrument’s enclosure. Leave a 1/2 to 1 inch drip loop under the cable strain relief. 12.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 3. Strip one inch of the outer insulation from the cable. Warning! Keep wires away from the rotating magnetic spindle in the Honeywell Instrument. 4. Strip 0.25 inch individual wire insulation from the red, white, and blue lead wires. – Count enabling wire (pulsed ground reference) – Count sensing wire (high impedance positive reference) – Cut cable sensing wire (positive return) 5.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Code Settings. For Item Code Settings, see Programming Parameters on page 75. 6. Connect the red wire following the Item Code Settings. For Item Code Settings, see Programming Parameters on page 75. Note: In Honeywell Instrument EC-AT correctors, the connector may be soldered to the pulse board.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 8. Tighten the large strain relief securely. Warning! Do not crush the module through-cables when tightening the strain relief. 9. Re-install or reconnect the power or battery sources. 10. Close the instrument case and tighten the case screw securely. Replace any locks that were removed for installation. 11. Install the Cellular 500G. See Mounting on page 12.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation part number 22-1929) Completing the Connections 1. Connec. The Cellular 500G to receive TCI pulse readings. Note: Connect one module/channel to the alarm output if the modules are used on channels A and B. 2. Remove strain relief fitting by unscrewing it from the gray adapter plate. Note: Do not remove the fitting’s hex nut. Unscrew the entire fitting from the gray adapter plate.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Configuration for two modules connected to one TCI Green Red White Blue 7. Insert one unterminated wire into an opening of a gel-connector (six gel-connectors were included with the TCI). 8. Insert the appropriate field cable wire into the other gel-connector opening. 9. Verify that both wires are fully inserted into the gel-connector prior to crimping.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Software Settings 1. Connect the interface cable from the Honeywell instrument to a PC loaded with the MasterLink SQL software. 2. Open the MasterLink SQL software. The software opens and reports a “Not Connected” status. The Site List window automatically opens after the software detects an instrument. 3. Select the Honeywell instrument type from the Instrument List on the right of the screen.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation A Change Item pop-up provides the interface to change the setting. 7. Enter the correct setting. Click Save. 8. Confirm that all settings match the settings required for the module connected to the Honeywell Instrument. For more information, see compatible modules listed in Honeywell Instrument Installation on page 64.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Channel A Corrected Volume Channel B Uncorrected Volume Channel C Pulse Output Spacing Instrument Pulse Output Options #56 #93 #57 #94 #58 #95 #115 ECAT Pulse Board Ver2(3) Form A 2 Cor Vol 2 Unc Vol 2 Cor Vol 1=1.0 sec or 2=2.0 sec or 4=0.
Cellular 500G Module Remote Mount Installation Guide Meter model 4 Specific Meter Manufacturer Installation Meter notes Itron part number Notes #3 flat-face meter 400 Front-mount index ERG-7000-501 Requires a thicker gasket for magnet hub to clear index box. 1-hole gasket: FAB0014-001 2-hole gasket: FAB0014-002 4-hole gasket: FAB0014-003 675, 1000 National Meter Installation National/Lancaster meters are compatible with Cellular 500Gs with an encoder cable.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Romet Meter Installation This section describes installation for Romet meters and correctors compatible with Itron Cellular 500Gs. Meter model RM Series STD CTR 6005600 Meter notes Meter must have factory-installed pulser with connector output. Purchase cable interface from manufacturer.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 2. Connecting the module to the corrector.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 2. Insert the mounting screw fitted with the three lock washers. Two lock washers are used as spacers (as shown). . 3. Attach the mounting plate to the meter. Insert the mounting screw where the module screw was removed. Torque the mounting screw to 5-7 foot pounds to secure the plate to the Romet meter. 4. Moun.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Mechanical and Wiring Installation Instructions These instructions describe installation with Romet cables and setup options for the AdEM corrector and ECM2® meter. These instructions include the two most common setup configurations. For specialized setup instructions, contact Romet. 1. Remove the module backplate (four screws) to expose the module lead wires.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Standard AdEM Romet 43-035-40 Cable Wiring Connection Corrected count Romet cable Pulse Output 1+ Uncorrected count wire Green White Romet cable wire Red White Blue Pulse Output 1- White Blue Red Black Red Note: This wiring configuration will not allow a cut cable tamper.
Cellular 500G Module Remote Mount Installation Guide Cable pin 4 Specific Meter Manufacturer Installation Module wire Corrected Uncorrected Alarm D Red E White and blue Romet Cable Number 34-125-40 or 34-125-41 Cable pin Module wire Corrected Uncorrected A White and blue B Red C White and blue D Red Alarm E White and blue F Red Romet Cable Number 34-125-42 Cable pin Module wire Corrected Uncorrected A White and blue B Red Alarm C White and blue D Red E White and blue
Cellular 500G Module Remote Mount Installation Guide Cable pin 4 Specific Meter Manufacturer Installation Module wire Corrected Aux CC Alarm E White and blue F Red Romet Cable Number 34-125-44 Cable pin Module wire Aux CC A B C White and blue D Red E F Romet Cable Number 34-125-45 Cable pin Module wire Corrected Uncorrected A White and blue B Red C Alarm White and blue D Red E White and blue F Red Romet Cable Number 34-125-50 Cable pin Module wire Corrected Uncorrected 1
Cellular 500G Module Remote Mount Installation Guide Cable pin 4 Specific Meter Manufacturer Installation Module wire Corrected Uncorrected 4 Alarm Red 5 Red 6 White and blue Romet Cable Number 34-125-51 Cable pin Module wire Correct 1 2 Uncorrected Red White and blue 3 White and blue 4 5 Aux CC Red Red 6 White and blue 4. After the wire connections are completed, install a cable tie to the meter cable just below the exposed colored lead wires on the cable insulation. 5.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 7. Install the Cellular 500G backplate using the four screws previously removed from the module and a Torx T-10 screwdriver. Important! Verify that the cable tie and gel connectors are inside the module housing and the cable extends out of the slot in the backplate. Torque the backplate mounting screws to 9 to 12 inch-pounds. 8.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation c. Click Close. d. Confirm that the meter was added to the Phone Book. e. Set up the corrected or uncorrected parameters. f. From the Talk to Unit tab, select Setup > Default. DRAFT October 11, 2021 815-0622-00 REV 000 Itron, Inc.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation g. Set the following Default Setup Group parameters: • Enter the desired Cor. Volume Unit parameter. Set Cor. Pulse Volume to the same number of units. • For Output Pulse Spacing, enter the largest number over 285mS that works for your application. Itron recommends a setting of 350 ms. • For Output Pulse Width, enter the largest number over 28 ms that works for your application.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 4. Set the ECM2 output pulse spacing to 750 ms for operation with the Cellular 500G. Output spacing represents an off-time between pulses. Sensus Meter Installation This section describes Cellular 500G installation on compatible Sensus meters. Meter model Meter notes Sonix meters are pulse output registers which are programmed by Sensus software.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation 1 Top anchor screw positions 2 Bottom anchor position for the module U-shaped mount Order the correct Sensus Sonix direct mount bracket for your installation requirements from Sensus North American Gas Customer Service. (Brackets and mounting hardware are ordered separately). Sensus Sonix direct mount brackets* and mounting hardware Sensus part number Description 60025-063-00000 1.
Cellular 500G Module Remote Mount Installation Guide 4 Specific Meter Manufacturer Installation Mechanical and Wiring Installation Instructions Sensus Sonix meters provide a standard Form A electronic pulse output compatible with the Cellular 500G. You may connect the Sensus Sonix meter to the Cellular 500G using the pulse output cable or you can directly mount the Cellular 500G to the meter.
5 Using Gel-cap Connectors to Complete Wiring Connections This section provides the instructions to complete Cellular 500G to meter wiring connections. Gel-cap connections require: ■ E-9R 3M® gel-cap crimping tool ■ 3M gel-cap connectors (Itron part number CON-0023-001) 1. Push the two wires into the connector as far as possible. Caution: Do not strip insulation from the ends of the wires before inserting them into the connector. 2.
Cellular 500G Module Remote Mount Installation Guide 5 Using Gel-cap Connectors to Complete Wiring Connections . 4. The connector is properly crimped when the top of the moveable yellow center (1) is flush with the top of the connector body (2). Warning! Crimping the connector forces sealant out of the connector. The sealant protects the inside of the connector against insects, moisture, or other contaminants. The sealant may cause minor eye and skin irritation. Avoid eye contact.
6 Optional Sealant Application Instructions In areas where insect intrusion is a problem, Itron recommends an optional sealant to help keep insects out of the module housing. The Itron-tested and approved sealant (Itron part number ADH-5106-000) is used to seal gaps in Cellular 500G installations that can allow insect intrusion. 1. Prepare the module for the sealant by verifying the application area is clean and dry. Warning! Apply sealant in a well-ventilated area. 2.
Cellular 500G Module Remote Mount Installation Guide 6 Optional Sealant Application Instructions the sealant tube. DRAFT October 11, 2021 815-0622-00 REV 000 Itron, Inc.
A Important Safety and Compliance Information This section provides important information for your safety and product compliance. U.S. and Canadian Patent Numbers U.S. Patent Numbers ■ 4,614,945 ■ 4,753,169 ■ 4,768,903 ■ 4,799,059 ■ 4,867,700 Canadian Patent Numbers ■ 1,254,949 ■ 1,267,936 ■ 1,282,118 USA, FCC Part 15 Spectrum Compliance This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: 1.
Cellular 500G Module Remote Mount Installation Guide A Important Safety and Compliance Information turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: ■ Reorient or relocate the receiving antenna. ■ Increase the separation between the equipment and receiver. ■ Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
Cellular 500G Module Remote Mount Installation Guide A Important Safety and Compliance Information RF Exposure (FCC/ISED) This equipment complies with radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 20 cm between the radiator and your body. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter.
Cellular 500G Module Remote Mount Installation Guide A Important Safety and Compliance Information Electrostatic Ignition Hazard Warning! Verify the area is not hazardous when installing, servicing, cleaning, or touching the Itron device. Module Cleaning Warning! Clean only with a damp cloth. Do Not Drop Warning! While Itron modules are designed to withstand a drop, dropping the module may damage the device and void the warranty. DRAFT October 11, 2021 815-0622-00 REV 000 Itron, Inc.